Suppliers details:
SENER (Heliostats)
Foster Wheeler (Steam generation)
Guardian (Mirrors)
AKO (Electric heat tracing)
Lazaro Ituarte Valves (Valves)
CCI (Valves)
Flowserve (Control valves)
Ideas en Metal (Metalic structures)
Leser (Safety valves)
Saidi (Valves)
Sindus (Cooling tower)
Smit
TSK
Wika (pressure and temperature measurement)
Imasa (Power block and BOP pipes)
Energia Gigjon (Metal sttructures)
Flexim (Flowmeter for HTF and/or Molten Salt)
Schubert & Salzer - BVALVE (Valves)
Esindus (Cooling towers)
Sulzer (Pumps)
Ensival Moret (Pumps)
BEROA (Tower construction)
The plant became operational in May 2011 and was inaugurated on October 2011, by HM the King of Spain Juan Carlos I and HH Sheikh Mohamed Bin Zayed.