Berry Petroleum EOR plant

Group

General Info

Owner/s: 

  • Berry Petroleum

Technology: 

  • Parabolic trough

Country: 

  • US

Status: 

  • Operational

Purpose: 

  • Demonstration

Usage: 

  • Steam generation

Thermal power: 

7.00 MWth

Start date: 

February, 2011

Location: 

Kern County, California
General comments:

In February 2011, GlassPoint unveiled the world’s first commercial solar enhanced oil recovery (EOR) project at Berry Petroleum’s 21Z lease in Kern County, California. Built in less than six weeks—a testament to GlassPoint’s architecture and execution capability–the system uses the sun’s radiant heat to produce approximately 1 million Btus per hour of solar heat.

GlassPoint partnered with local firms TJ Cross Engineers and PCL Industrial Services to construct the system, which spans 7,000 square feet of land on the 100-year old oilfield. The enclosed trough preheats water to 190°F used as feedwater for Berry Petroleum’s gas-fired steam generators.

Documents and links:
Berry Petroleum EOR plant Berry Petroleum EOR plant Berry Petroleum EOR plant Berry Petroleum EOR plant Berry Petroleum EOR plant
Videos: